[1]
Altonen, K. & Sivonen, R. (2009). Response Strategies to Stakeholders Pressures in Global Projects, International Journal of Project Management, 27: 131-141.
DOI: 10.1016/j.ijproman.2008.09.007
Google Scholar
[2]
Amaeshi, K., (2007). Exploring the Institutional Embeddedness of Corporate Stakeholding and Social Responsibility: a Comparative Political Economy Perspective, Unpublished PhD Thesis, Warwick Business School, University of Warwick.
Google Scholar
[3]
Andersson, P. & Johansson, A. (2012). Disturbances of the Surrounding in an Urban Infrastructure Project, MSc Dissertation submitted to the Department of Civil Engineering, Chalmers University of Technology, Sweden. Arbor: University of Michigan Press.
Google Scholar
[4]
Barzilai, G (2003). Communities and Law: Politics and Cultures of Legal Identities. Ann.
Google Scholar
[5]
BDOR & Capener, P. (2007). The Protocol for Public Engagement with Proposed Wind Energy Developments in England: a report for the Renewables Advisory Board and DTI, available @http://www.berr.gov.uk/files/file38708.pdf, accessed on 2/7/13
Google Scholar
[6]
Blood, A. (2013). Stakeholders Engagement: Reclaiming the Balance when Economics Dominate, IAIAConference Proceeding of ''Impact Assessment: The Next Generation'' 33rd Annual Meeting of the International Association for Impact Assessment 13 – 16th May, Calgary Stampede BMO Centre Calgary, Alberta, Canada.
Google Scholar
[7]
Burningham, K. (2000) Using the language of NIMBY: a topic for research not an activity for researchers. Local Environment, 5(1); 55-67.
DOI: 10.1080/135498300113264
Google Scholar
[8]
Caputo, A. (2013). Systemic Stakeholders' Management for Real Estate Development Projects, Global Business and Management Research: an International Journal, 5(1): 66-82.
Google Scholar
[9]
Chinyio, B and Olomolaiye, P (2010) (Eds), Construction Stakeholder Management, Oxford: John Wiley & Sons, 23-46.
Google Scholar
[10]
Cleland, D. I. 1999. Project Management - Strategic Design and Implementation, McGraw-Hill.
Google Scholar
[11]
Dada, M.O. (2013). Client and Consultant Organisations' Assessment of Design Bid Build Procurement Practice in Nigeria, Journal of Building Performance, 4(1): 1-12.
Google Scholar
[12]
Devellis, R.F. (2003). Scale Development: Theory and Applications (2nd edition). California: Thousand Oaks, Sage.
Google Scholar
[13]
Ekung, S. B. (2013c). Analysis of Stakeholders Impacting Project Outcomes in Conflict Zones, Australian Journal of Building Economic and Property Management in review
Google Scholar
[14]
Ekung, S.; Ogboji, M.; & Okonkwo, E. (2013a). Extenuating Community Protest in Controversial Projects Scenarios in the Niger Delta- a Case for CSR, in Ibrahim, A.D. (ed) (2013). Proceeding of the 1st NIQS Research Conference, Innovative and Sustainable Management of Building and Infrastructure Projects, International Conference Centre, Abuja, September 2-5th.
Google Scholar
[15]
Ekung, S.B. (2013b). An Investigation into the Cost of Stakeholders' Engagement in Conflicts Zones, MSc Dissertation Submitted to the School of Built Environment, University of Salford, UK.
Google Scholar
[16]
Erikkson, P.E. (2008). Procurement effects on coopetition on client contractor relationships, Journal of construction Engineering and Management, 134(2); 103-111.
DOI: 10.1061/(asce)0733-9364(2008)134:2(103)
Google Scholar
[17]
Gable C., Shireman B., (2005). Stakeholder Engagement: A three Phase Methodology, Environmental Quality Management, 4(3): 9-24
DOI: 10.1002/tqem.20044
Google Scholar
[18]
Giacomo, L. (2011). Armed Conflicts and Security of Oil and Gas Supplies, CEPS Working Document, Thinking Ahead of Europe, No.352, June.
Google Scholar
[19]
Gjolberg, M. 2009. The origin of corporate social responsibility: global forces or national legacies? Socio-Economic Review, 7, 605-637.
DOI: 10.1093/ser/mwp017
Google Scholar
[20]
Glass, J., Simmonds, M. (2007). "Considerate construction": Case Studies of Current Practice, Engineering, Construction and Architectural Management, (14)2: 131-149.
DOI: 10.1108/09699980710731263
Google Scholar
[21]
Greenwood, M. (2007). Stakeholder Engagement: beyond the Myth of Corporate Responsibility, Journal of Business Ethics, 74: 315-327
DOI: 10.1007/s10551-007-9509-y
Google Scholar
[22]
Idoro, G.I., Iyagba, R.O.A. & Odusami, K.T. (2007). Evaluation of the use of Design-bid-build Procurement System in the Nigerian Construction Industry. Construction Research Journal 1(1): 15-25.
Google Scholar
[23]
Ihugba, B.U. & Osuji, O.K. (2011). Corporate Citizenship and Stakeholder Engagement: Maintaining an Equitable Power Balance, Electronic Journal of Business Ethics and Organisation Studies, 16(2): 28 -38.
Google Scholar
[24]
http://urn.fi/URN:NBN:fi:jyu- 201201301092 accessed 3/6/13
Google Scholar
[25]
James N., and Phillips, R., (2010), Stakeholder Engagement, Discourse Ethics and Strategic Management, International Journal of Management Reviews DOI: 10.1111/j.1468- 2370.2009.00279.x available@
DOI: 10.1111/j.1468-2370.2009.00279.x
Google Scholar
[26]
Jawahar, I.M. & McLaughlin, G.L. (2001). Towards a descriptive Stakeholder Theory: An Organizational Life Cycle Approach, Academy of Management Review, 26(3), 397-414.
DOI: 10.5465/amr.2001.4845803
Google Scholar
[27]
Kivits RA (2013). Multi-dimensional Stakeholder Analysis: a Methodology Applied to Australian Capital city Airports', PhD thesis, Southern Cross University, Lismore, NSW.
Google Scholar
[28]
Kumar, R. (2011). Research Methodology, a Step-by-Step Guide for Beginners, London: SAGE.
Google Scholar
[29]
Li, B.; Akintoye, A.; Edwards, P.J.; & Hardcastle, C. (2005). Critical Success Factors for PPP/PFI Projects in the UK Construction Industry, Construction Management and Economics, 23: 459-471.
DOI: 10.1080/01446190500041537
Google Scholar
[30]
Loosemore, M. (2000). Crisis Management in Construction Projects, Virginia: ASCE Press.
Google Scholar
[31]
McCabe, A. C., Keast, R. L., & Brown, K. A. (2006). Community Engagement: Towards Community as Governance, paper presented at the Governments and Communities in Partnership Conference, Melbourne, Australia.
Google Scholar
[32]
Newcombe, R. (2003). From Client to Project Stakeholders: a Stakeholder Mapping Approach, Nottingham UK, Association of Researchers in Construction Management, 43-52.
Google Scholar
[33]
Nguyen, N.H.; Skitmore, M.; Wong, J. & Kwok,W. (2009). Stakeholder Impact Analysis of Infrastructure Project Management in Developing Countries: a Study of Perception of Project Managers in State-owned Engineering Firms in Vietnam, Construction Management and Economics, 27(11): 1129-1140.
DOI: 10.1080/01446190903280468
Google Scholar
[34]
Odusami, K.T; Iyaba, R.R. & Omirin, M.M. (2003). The Relationship between Project Leadership, Team Composition and Construction Project Performance in Nigeria, Journal of International Project Management 21; 519-527.
DOI: 10.1016/s0263-7863(02)00059-5
Google Scholar
[35]
Ojesina, A.O. 1999: The role of the public in the Environmental Impact Assessment process. In Adewoye, R.O. and Adegoke, O.S. (eds) Capacity Building for Environmental Impact Assessment in the Benue Trough Federal Environmental Protection Agency (FEPA), Abuja, pp.156-160.
Google Scholar
[36]
Olander, S. & Landin, A. (2005). Evaluation of Stakeholder Influence in the Implementation of Construction Projects, International Journal of project Management, 23: 321-328.
DOI: 10.1016/j.ijproman.2005.02.002
Google Scholar
[37]
Olander, S. (2009). Analysis of External Stakeholder Influence on Construction Projects, Proceeding of 5th Nordic Conference on Construction Economic and Organisation, Raykjavik, Iceland, 10 -12 June.
Google Scholar
[38]
Olander, S., and Landin, A. (2008). A Comparative Study of Factors Affecting the External Stakeholder Management Process, Construction Management and Economics 26(6): 553
DOI: 10.1080/01446190701821810
Google Scholar
[39]
Pallant, J. (2010). SPSS Survival Manual: A Step by Step Guide to Data Analysis using the SPSS Program, 4th Edition, New York: McGraw Hill Education
DOI: 10.4324/9781003117452
Google Scholar
[40]
Pikaar, E. (2011). Stakeholder Engagement in Shale Exploration Project: Supporting Societal Embedding, MSc Dissertation, Management Technology, Delft University of Technology.
Google Scholar
[41]
Takim, R. (2009). The Management of Stakeholders' Needs and Expectations in the Development of Construction Projects in Malaysia, Modern Applied Science, 3(5): 167-175
Google Scholar
[42]
Teo M.M.M and Loosemore M (2012) A New Research Agenda into Community-based Protest in Construction In: Smith, S.D (Ed) Procs 28th Annual ARCOM Conference, 3- 5 September 2012, Edinburgh, UK, Association of Researchers in Construction Management, 1135-1143. ( Received 13 June 2014; accepted 18 July 2014 )
Google Scholar